Client- Babcock
Date- Ongoing
Location- Rosyth Dockyard
Work- Strip out old equipment, modify and convert the gear box operation into digital PLC control.
Client- Cammell Laird
Location- Birkenhead (River Mersey)
Work- Pipe installation on Royal Research Ship.
Date- September 2018
Work- Strip out equipment, pipe work and replace hydraulic motors, electric motors and controls.
Client- AMEC and Conoco Philips
Date- June 2014
Location- Britannia Platform North Sea
Work- Designed hydraulic cylinders for mono-column and supplied pump units and power packs.
Client- Ross-Shire Engineering
Date- June 2013
Location- Invergordon
Work- Pipe installation and pressure testing/flushing.
Client- Calmac
Date- October 2012
Location- Leith/Greenock
Work- Stabiliser units replacement on 3 Calmac''s major vessels.